CET Berthing Schemes
Customer: Edmund Nuttall
Site Owner: Network Rail
Value: £1M
Working with Edmund Nuttall under their Vendor Accord Scheme, FSD were awarded two phases of work at Clapham, Farnham and Fratton Railway Stations. These works are associated with the CET berthing scheme (Controlled Effluent Transfer) and consisted of the following:
- Supply and installation of approximately 150 platform lighting columns, with individual winch mechanisms
- Supply and installation of lighting on new gantries
- Supply and installation of site wide power distribution systems
- Interfacing with existing power distribution systems
- Supply and installation of CET platform socket outlets
- Supply and installation of emergency lighting as required
- Installation of gate access system at Clapham
- Supply and installation of 800A feeder pillar and connections to transformer at Farnham
- Supply and installation of complete points heating system at Farnham, including local control panels, transformers and elements
- Supply and installation of gantry control panels
- Supply and installation of lighting control panels
- Supply and installation of foul water pumping station at Farnham
- Supply and installation of potable water booster set at Farnham
- Provide power supply and lighting for new carriage washing machines at Farnham and Fratton
- Electrical works associated with new shunters accommodation and cable diversions at Fratton