CTRL Phase 2 – Substation Works
Customer: Birse
Site Owner: Network Rail
Value: £4M+
Following our success on the first phase of the Channel Tunnel Rail Link (CTRL) scheme, FSD were awarded a further 22 substation contract by Birse, working on sites stretching from Kent to St. Pancras.
The contract includes the following works at each site:
- Supply and Install all Medium Voltage (MV) cabling and connections between the MV substations and the switchgear
- Design, supply and installation of manual emergency tripping systems
- Design, supply and installation of building services
- Design, supply and installation of fire alarm systems
- Design, supply and installation of intruder systems
- Design, supply and installation of busbar systems ranging from 1600A to 6300A
- Supply of Telemetry Marshalling Panels (EMMIS) and all inter-connecting cabling to enable remote control and monitoring
Working in five teams consisting of Technicians, Electricians and Specialist Cable Installers, these works were completed during 2007.